From: route@monster.com
Sent: Friday, August 19, 2016 10:52 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
RESUME ARTHUR (ART) LOPEZ (1/3) Name:Arthur (ART)
Lopez
Title:Planner/Scheduler
Education:Short Courses: Electrical
1 and Electrical 2
Special
Training:Primavera 6, SAP, Maximo,
FLA 6
Licenses:Electrician Journeyman
Texas
Certifications:NCCER
I have more than 16
years’ experience in the commercial and industrial industries. I have held
positions of electrician, electrical technician, electrical foreman,
electrical general foreman, I&E planner, scheduler and I&E estimator.
I have worked overseas as an electrician and electrical foreman providing
services to our military in Iraq and Afghanistan, and I was in charge of all
I&E take-offs on a $250MM Flare Gas Recovery project in Carson, Ca. Representative
assignments include: ·
I&E
Planner, Turnaround Planning, Ascend Materials Alvin, TX. Responsibilities included building work
packages for TAR in June; Walking out work packages; taking pictures of scope
in the field; Working in SAP to verify Work Orders, order material and verify
resources; working in P6 in Master schedule to step out plans and over 3
units for T/A, attend weekly meetings, worked with manufactures to verify
specs and delivery dates, and work with procurement on material issues,
worked with multiple subcontractors with their portion of the TAR. ·
Planner/Scheduler,
Capital Projects, Marathon Petroleum Refinery in Texas City, TX. I develop project schedules and execution
plans; I work on multiple small to mid-cap projects parallel; job walks to
verify progress; resource load, moving data date and assist with T/A as
needed; I participate in client IPS review; internal project management and
departmental weekly and bi-weekly meetings; I also took care of all I&E
take-off’s and I&E Estimates on small-mid size capital project’s; I build
schedules with multiple disciplines. (civil, pipe, structural, elect. and
inst.) ·
Electrical
Foreman, Logcap IV, DOD, FOB Salerno, Afghanistan. Responsibilities included ensuring work orders
were completed on time and ordering material for projects; conducted safety
meetings daily to assure everyone was updated with any changes and to remind
them to fill out JSA’s; worked in Maximo to track work progress and material;
perform all material take-offs on all projects that were awarded under
$5,000; filled in as E1 as needed including in charge of all daily operations
at the Electrical Shop; perform job walks to find discrepancies on electrical
installations. ·
I&E
Planner/Scheduler, Flare Gas Project, Enterprise, TCACP, BP, Texas City, TX. Responsibilities include all I&E take-offs
for all projects; worked with cost to help with unit rates and budget, worked
with schedulers on logic entries and updates, attended weekly meetings,
performed job walks for weekly updates on schedule and cost, worked with
manufactures to verify specs and delivery dates, and work with procurement on
material issues. ·
Electrician,
Logcap III, DOD, FOB Fallujah, Iraq. Responsibilities included providing services for our military;
wired up and worked on generators ranging from 4KVA to 1 MEG, installed
lights, receptacles and conduit as needed on new projects; built MWR and
DFAC, which included ordering material, figuring out wire size per piece of
equipment, learned and worked on European voltage 230-400VAC 50 Hertz
systems, made sure all paper work was in place to have a safe work environment. ·
I&E
Planner/Scheduler, Flare Gas Recovery, BP, Carson, CA. Responsibilities include all I&E take-offs
for all projects; worked with cost to help with unit rates and budget, worked
with schedulers on logic entries and updates, attended weekly meetings,
performed job walks for weekly updates on schedule and cost, worked with
manufactures to verify specs and delivery dates, and work with procurement on
material issues, worked with multiple subcontractors with their portion of
the schedule, attended weekly meetings on projects. ·
Electrical
General Foreman, Chiller Re-Vamp, MD Anderson, Houston, TX. Responsibilities include conducting safety
meetings daily to assure everyone was updated with any changes and to remind
them to fill out their JSA’s, planning and executing all electrical scope,
installation of cable tray, conduit, over 100 stress cones, UPS system, and
the wiring 4160 chillers; also worked with rental companies to assure all
equipment needed was on site. ·
Electrical
General Foreman, Capital Project, BP, Carson, CA. Responsibilities included Coker revamp T/A,
Hydrocracker upgrades, Tank Farm revamp, 250KVA transformer swap out, and
multiple other projects, supervised 3 crews on different projects and a total
of 40 personnel; responsible for all planning and ensuring all crews used the
correct material, tools and equipment; attended all meetings and worked with
schedulers and cost personal. Special
Fields of Knowledge: Flare
Gas Analyzer
Shelter Project Building
Program (Shelter’s Project) TWIC P6 SAP I&E
Estimates Languages: English Spanish Employment
History: TGE Industrial
Services
2015 to Present I&E Planner Jacobs Engineering
Group Inc.2013 to 2015 Scheduler Fluor2011 to 2013 Electrical Foreman Jacobs Engineering
Group Inc.2009 to 2011 I&E Planner KBR2008 to 2009 Electrician Jacobs Engineering
Group Inc. (KBR)2007 to 2008 I&E Planner Merit2006 to 2007 Electrical General
Foreman Jacobs Engineering
Group Inc. 2001 to 2006 Electrical General
Foreman Art Lopez, Cell - 713-492-1146, Email - art.lopez31@yahoo.com |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Advanced |
|
|
|